Oracle Method
AIM Advantage 3.1 - Application Implementation Method
About
Method Navigation
Current Page Navigation

Phase Overviews

[A] Definition
[B] Operations Analysis
[C] Solution Design

[D] Build
[E] Transition
[F] Production

Process Overviews

[BP] Business Process Architecture
[RD] Business Requirements Definition
[BR] Business Requirements Mapping

[TA] Application and Technical Architecture

[MD] Module Design and Build
[CV] Data Conversion
[DO] Documentation
[TE] Business System Testing
[PT] Performance Testing
[AP] Adoption and Learning
[PM] Production Migration


Tasks & Deliverables

[BP] Business Process Architecture
[RD] Business Requirements Definition
[BR] Business Requirements Mapping

[TA] Application and Technical Architecture

[MD] Module Design and Build
[CV] Data Conversion
[DO] Documentation
[TE] Business System Testing
[PT] Performance Testing
[AP] Adoption and Learning
[PM] Production Migration

References

Project Roles
Optional Task Criteria

Glossary

TASKS AND DELIVERABLES

[BP] Business Process Architecture

Phase
Task Overview
Deliverable Template
Core/Opt
Definition
A
BP.010 Define Business and Process Strategy
Business and Process Strategy
Optional
A
BP.020 Catalog and Analyze Potential Changes Change Catalog
Optional
A
BP.030 Determine Data Gathering Requirements Data Gathering Requirements
Optional
A
BP.040 Develop Current Process Model Current Process Model
Optional
A
BP.050 Review Leading Practices Leading Practices Review
Optional
A
BP.060 Develop High-Level Process Vision High-Level Process Vision
Optional
A
BP.070 Develop High-Level Process Designs High-Level Process Designs
Core
Operations Analysis
B
BP.080 Develop Future Process Model
Future Process Model
Core
Solution Design
C
BP.090 Document Business Procedures Business Procedure Documentation
Core

Back to Top

[RD] Business Requirements Definition

Phase
Task Overview
Deliverable Template
Core/Opt
Definition
A
RD.010 Identify Current Financial and Operating Structure
Current Financial and Operating Structure
Core
A
RD.020 Conduct Current Business Baseline Current Business Baseline
Process Questionnaire
Core
Operations Analysis
B
RD.030 Establish Process and Mapping Summary Process and Mapping Summary
Optional
B
RD.040 Gather Business Volumes and Metrics Business Volumes and Metrics
Core
B
RD.050 Gather Business Requirements Business Requirements Scenarios
Core
B
RD.060 Determine Audit and Control Requirements Audit and Control Requirements
Core
B
RD.070 Identify Business Availability Requirements Business Availability Requirements
Core
B
RD.080 Identify Reporting and Information Access Requirements Master Report Tracking List
Core

Back to Top

[BR] Business Requirements Mapping

Phase
Task Overview
Deliverable Template
Core/Opt
Operations Analysis
B
BR.010 Analyze High-Level Gaps
High-Level Gap Analysis
Core
B
BR.020 Prepare Mapping Environment
Configuration Mapping Environment
Core
B
BR.030 Map Business Requirements
Mapped Business Requirements
Core
B
BR.040 Map Business Data No deliverable template provided. Use the Conversion Data Mapping (CV.040) template to create the supporting deliverable for this task.
Core
B
BR.050 Conduct Integration Fit Analysis Integration Fit Analysis
Optional
B
BR.060 Create Information Model Information Model
Optional
B
BR.070 Conduct Reporting Fit Analysis No deliverable template provided. Update the Master Report Tracking List (RD.080) deliverable to create the supporting deliverable for this task.
Core
B
BR.080 Test Business Solutions Business Mapping Test Results
Optional
B
BR.090 Confirm Integrated Business Solutions No deliverable template provided. Use the Acceptance Certificate (PJM.CR.080) template to support the deliverable for this task.
Core
Solution Design
C
BR.100 Define Application Setups Application Setup Documents
Core
C
BR.110 Design Security Profiles Security Profiles
Core

Back to Top

[TA] Application and Technical Architecture

Phase
Task Overview
Deliverable Template
Core/Opt
Definition
A
TA.010 Define Architecture Requirements and Strategy Architecture Requirements and Strategy
Core
A
TA.020 Identify Current Technical Architecture Current Technical Architecture Baseline
Optional
A
TA.030 Develop Preliminary Conceptual Architecture
Preliminary Conceptual Architecture
Optional
Operations Analysis
B
TA.040 Define Application Architecture Application Architecture
Optional
B
TA.050 Define System Availability Strategy System Availability Strategy
Core
B
TA.060 Define Reporting and Information Access Strategy Reporting and Information Access Strategy
Optional
B
TA.070 Revise Conceptual Architecture No deliverable template provided. Update the Preliminary Conceptual Architecture (TA.030) deliverable to record the changes to the Conceptual Architecture.
Optional
Solution Design
C
TA.080 Define Application Security Architecture Application Security Architecture
Optional
Build
D
TA.090 Define Application and Database Server Architecture Application and Database Server Architecture
Optional
D
TA.100 Define and Propose Architecture Subsystems Architecture Subsystems Proposal
Optional
D
TA.110 Define System Capacity Plan System Capacity Plan
Core
D
TA.120 Define Platform and Network Architecture Platform and Network Architecture
Core
D
TA.130 Define Application Deployment Plan Application Deployment Plan
Optional
D
TA.140 Assess Performance Risks Performance Risk Assessment
Core
D
TA.150 Define System Management Procedures System Management Procedures
Core

Back to Top

[MD] Module Design and Build

Phase
Task Overview
Deliverable Template
Core/Opt
Definition
A
MD.010 Define Application Extension Strategy
Application Extension Strategy
Optional
Operations Analysis
B
MD.020 Define and Estimate Application Extensions Application Extension Definition and Estimates
Optional
Solution Design
C
MD.030 Define Design Standards
Design Standards
Optional
C
MD.040 Define Build Standards
Build Standards
Optional
C
MD.050 Create Application Extensions Functional Design Application Extensions Functional Design
Optional
C
MD.060 Design Database Extensions Database Extensions Design
Optional
C
MD.070 Create Application Extensions Technical Design Application Extensions Technical Design
Optional
C
MD.080 Review Functional and Technical Designs No deliverable template provided. Use the Review Comments List (PJM.QM.020) and the Acceptance Certificate (PJM.CR.080) templates to support the deliverable for this task.
Optional
Build
D
MD.090 Prepare Development Environment Development Environment
Optional
D
MD.100 Create Database Extensions No deliverable template provided. Refer to the MD.100 task overview for guidance.
Optional
D
MD.110 Create Application Extension Modules No deliverable template provided. Refer to the MD.110 task overview for guidance.
Optional
D
MD.120 Create Installation Routines Installation Routines
Optional

Back to Top

[CV] Data Conversion

Phase
Task Overview
Deliverable Template
Core/Opt
Definition
A
CV.010 Define Data Conversion Requirements and Strategy
Data Conversion Requirements and Strategy
Optional
Solution Design
C
CV.020 Define Conversion Standards Conversion Standards
Optional
C
CV.030 Prepare Conversion Environment
Conversion Environment
Optional
C
CV.040 Perform Conversion Data Mapping
Conversion Data Mapping
Optional
C
CV.050 Define Manual Conversion Procedures Manual Conversion Procedures
Optional
C
CV.060 Design Conversion Programs Conversion Program Design
Optional
C
CV.070 Prepare Conversion Test Plans Conversion Test Plans
Optional
Build
D
CV.080 Develop Conversion Programs No deliverable template provided. Refer to the CV.080 Task Overview for guidance.
Optional
D
CV.090 Perform Conversion Unit Tests No deliverable template provided. Use the Conversion Test Plans (CV.070) deliverable to record the test results in support of this deliverable.
Optional
D
CV.100 Perform Conversion Business Object Tests No deliverable template provided. Use the Conversion Test Plans (CV.070) deliverable to record the test results in support of this deliverable.
Optional
D
CV.110 Perform Conversion Validation Tests No deliverable template provided. Use the Conversion Test Plans (CV.070) deliverable to record the test results in support of this deliverable.
Optional
Transition
E
CV.120 Install Conversion Programs Installed Conversion Programs
Optional
E
CV.130 Convert and Verify Data Converted and Verified Data
Optional

Back to Top

[DO] Documentation

Phase
Task Overview
Deliverable Template
Core/Opt
Definition
A
DO.010 Define Documentation Requirements and Strategy Documentation Requirements and Strategy
Core
A
DO.020 Define Documentation Standards and Procedures Documentation Standards and Procedures
Optional
A
DO.030 Prepare Glossary
Glossary
Core
Operations Analysis
B
DO.040 Prepare Documentation Environment Documentation Environment
Optional
B
DO.050 Produce Documentation Prototypes and Templates No deliverable template provided. Refer to the DO.050 Task Overview for guidance.
Optional
Build
D
DO.060 Publish User Reference Manual
User Reference Manual
Optional
D
DO.070 Publish User Guide User Guide
Optional
D
DO.080 Publish Technical Reference Manual Technical Reference Manual
Optional
D
DO.090 Publish System Management Guide System Management Guide
Optional

Back to Top

[TE] Business System Testing

Phase
Task Overview
Deliverable Template
Core/Opt
Definition
A
TE.010 Define Testing Requirements and Strategy
Testing Requirements and Strategy
Core
Solution Design
C
TE.020 Develop Unit Test Script
Unit Test Script
Optional
C
TE.030 Develop Link Test Script
Link Test Script
Optional
C
TE.040 Develop System Test Script System Test Script
Core
C
TE.050 Develop Systems Integration Test Script Systems Integration Test Script
Optional
Build
D
TE.060 Prepare Testing Environments Testing Environments
Core
D
TE.070 Perform Unit Test No deliverable template provided. Use the Unit Test Script (TE.020) deliverable to record the test results in support of this deliverable.
Optional
D
TE.080 Perform Link Test No deliverable template provided. Use the Link Test Script (TE.030) deliverable to record the test results in support of this deliverable.
Optional
D
TE.090 Perform Installation Test No deliverable template provided. Update the Installation Routines (MD.120) deliverable to correct the installation instructions as necessary.
Optional
D
TE.100 Prepare Key Users for Testing No deliverable template provided. Refer to the TE.100 Task Overview for guidance.
Core
D
TE.110 Perform System Test System-Tested Applications
Core
D
TE.120 Perform Systems Integration Test Integration-Tested System
Optional
Transition
E
TE.130 Perform Acceptance Test Acceptance Test Results
Core

Back to Top

[PT] Performance Testing

Phase
Task Overview
Deliverable Template
Core/Opt
Definition
A
PT.010 Define Performance Testing Strategy
Performance Testing Strategy
Optional
Operations Analysis
B
PT.020 Identify Performance Test Scenarios Performance Test Scenarios
Optional
B
PT.030 Identify Performance Test Transaction Models Performance Test Transaction Models
Optional
Solution Design
C
PT.040 Create Performance Test Scripts
Performance Test Scripts
Optional
C
PT.050 Design Performance Test Transaction Programs
Performance Test Transaction Program Design
Optional
C
PT.060 Design Performance Test Data Performance Test Data Design
Optional
C
PT.070 Design Test Database Load Programs Performance Test Database Load Program Designs
Optional
Build
D
PT.080 Create Performance Test Transaction Programs No deliverable template provided. Refer to the PT.080 Task Overview for guidance.
Optional
D
PT.090 Create Test Database Load Programs No deliverable template provided. Refer to the PT.090 Task Overview for guidance.
Optional
D
PT.100 Construct Performance Test Database No deliverable template provided. Refer to the PT.100 Task Overview for guidance.
Optional
D
PT.110 Prepare Performance Test Environment Performance Test Environment
Optional
D
PT.120 Execute Performance Test Performance Test Results
Optional
D
PT.130 Create Performance Test Report Performance Test Report
Optional

Back to Top

[AP] Adoption and Learning

Phase
Task Overview
Deliverable Template
Core/Opt
Definition
A
AP.010 Define Executive Project Strategy

Executive Project Strategy
Invitation Memorandum
Session Planning Checklist

Optional
A
AP.020 Conduct Initial Project Team Application Overview Customization
Invitation Memorandum
Project Team Orientation Plan
Session Planning Checklist
Core
A
AP.030 Develop Project Team Learning Plan Project Team Learning Plan
Core
A
AP.040 Prepare Project Team Learning Environment Project Team Learning Environment
Core
A
AP.050 Conduct Project Team Learning Events Skilled Project Team
Core
A
AP.060 Develop Business Unit Managers Readiness Plan Business Unit Managers Readiness Plan
High Level Systems Overview Customization
Invitation Memorandum
Session Planning Checklist
Optional
A
AP.070 Develop Project Readiness Roadmap Project Readiness Roadmap
Invitation Memorandum
Session Planning Checklist
Core
A
AP.080 Develop and Execute Communication Campaign
Communication Campaign
Core
Operations Analysis
B
AP.090 Develop Managers Readiness Plan Managers Readiness Plan
Application to Process Overview Customization
Invitation Memorandum
Session Planning Checklist
Optional
Solution Design
C
AP.100 Identify Business Process Impact on Organization
Business Process Organizational Impact
Optional
C
AP.110 Align Human Performance Support Systems
Human Performance Support Systems
Optional
C
AP.120 Align Information Technology Groups Aligned Information Technology Groups
Optional
C
AP.130 Conduct User Learning Needs Analysis User Learning Needs Analysis
Optional
C
AP.140 Develop User Learning Plan User Learning Plan
Core
Build
D
AP.150 Develop User Learningware User Learningware
Optional
D
AP.160 Prepare User Learning Environment User Learning Environment
Core
Transition
E
AP.170 Conduct User Learning Events User Learning Events Administration
Core
Production
F
AP.180 Conduct Effectiveness Assessment

Effectiveness Assessment
Invitation Memorandum

Session Planning Checklist

Core

Back to Top

[PM] Production Migration

Phase
Task Overview
Deliverable Template
Core/Opt
Operations Analysis
B
PM.010 Define Transition Strategy Transition Strategy
Core
Build
D
PM.020 Design Production Support Infrastructure
Production Support Infrastructure Design
Core
D
PM.030 Develop Transition and Contingency Plan
Transition and Contingency Plan
Core
Transition
E
PM.040 Prepare Production Environment Production Environment
Core
E
PM.050 Set Up Applications No deliverable template provided. Use the Application Setup Documents (BR.100) deliverable as a source for manual setup entry.
Core
E
PM.060 Implement Production Support Infrastructure No deliverable template provided. Refer to the PM.060 Task Overview for guidance.
Core
E
PM.070 Verify Production Readiness No deliverable template provided. Update the Transition and Contingency Plan (PM.030) deliverable to support the deliverable for this task.
Core
E
PM.080 Begin Production No deliverable template provided. Refer to the PM.080 Task Overview for guidance.
Core
Production
F
PM.090 Measure System Performance System Performance Assessment
Optional
F
PM.100 Maintain System No deliverable template provided. Refer to the PM.100 Task Overview for guidance.
Core
F
PM.110 Refine Production System No deliverable template provided. Refer to the PM.110 Task Overview for guidance.
Optional
F
PM.120 Decommission Former Systems No deliverable template provided. Refer to the PM.120 Task Overview for guidance.
Optional
F
PM.130 Propose Future Business Direction Business Direction Recommendations
Optional
F
PM.140 Propose Future Technical Direction Technical Direction Recommendations
Optional

Back to Top


Oracle